Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /www/htdocs/w0126eac/dev/wp-includes/functions.php on line 4169
Ford Front B299/B515 – MST Russia

Ford Front B299/B515

Parameter Value
dimension (mm) 2400x1500x1500
weight (kg) 250
capacity (pcs.) 6
series qty (pcs.) 88

Ford Front B299/B515

CLIENT
LLC Ford Sollers Holding


VEHICLE
Ford Fiesta, Ford EcoSport


PART
Front driver and passenger seats mod. B299 / B515


PURPOSE
Transportation and storage of automotive front seat parts, model B299/B515


DESCRIPTION
Customized metal rack equipped with movable shelf and special transportation lock


FEATURES

  • stackable
  • universal for 2 types of seats
  • manipulation from 4 sides
  • special transport safety lock
  • movable shelf for ergonomic usage
  • fast removable inlet

Project description

MST was commissioned to analyze, develop and manufacture the best logistic solution to supply “Front seat” parts from the manufacturer to the assembly line.The focus is to achieve the highest pack density in the tightest space, to develop a special safety lock to fix the goods in proper way during handling and transportation. Special ergonomic handling is a part of the task.  Easy handling during loading/unloading, stackable and handling from all sides goes without saying.Based on the technical requirements MST created a 3D-CAD model to analyze the best durable packaging solution. Internal FEM calculations allowed us to develop and manufacture a reliable rack with high pack density and special ergonomic usage.Manufactured was a prototype for transport and handling trials, based on the CAD development. After internal positive tests, the prototype was released to the customer for serial approval.Small objections from the prototype trials were considered and implemented in the series manufacturing.

Planned Actual
CAD development 5 weeks 4 weeks
PT manufacturing 6 weeks 6 weeks
PT loops 3 1
Series manufacturing 12 weeks 9 weeks
Contact usContact us