Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /www/htdocs/w0126eac/dev/wp-includes/functions.php on line 4169
Body side outer – MST Russia

Body side outer

Parameter Value
dimension (mm) 3616x2214x1450
weight (kg) 830
capacity (pcs.) 14
series qty (pcs.) 112

Body side outer

CLIENT
LLC Ford Sollers Holding


VEHICLE
Ford Mondeo III


PART
Body Side Outer left/right


PURPOSE
Transportation and storage of automotive body side outer parts, model CD391


DESCRIPTION
Customized metal rack equipped with HDPE supports and special transportation lock


FEATURES

  • stackable
  • high pack density
  • manipulation from 4 sides
  • special transport safety lock
  • foldable 1:4
  • fast removable inlet

Project description

MST was commissioned to analyze, develop and manufacture the best logistic solution to supply “Body Side Outer” parts from the manufacturer to the assembly line.
The focus is to achieve the highest pack density in the tightest space, to develop a special safety lock to fix the goods in proper way during handling and transportation. Special part protection and the opportunity of folding is a part of the task. Easy handling during loading/unloading, stackable and handling from all sides goes without saying.
Based on the technical requirements MST created a 3D-CAD model to analyze the best durable packaging solution. Internal FEM calculations allowed us to develop and manufacture a reliable rack with high pack density and folding functionality.
Manufactured was a prototype for transport and handling trials, based on the CAD development. After internal positive tests, the prototype was released to the customer for serial approval.
Small objections from the prototype trials were considered and implemented in the series manufacturing.

Planned Actual
CAD development 2 weeks 3 weeks
PT manufacturing 6 weeks 3 weeks
PT loops 1 1
Series manufacturing 9 weeks 7 weeks
Contact usContact us